Forming Die
Light weight, high strength and an attractive appearance have become the basic requirements for choosing passenger car wheels. High strength plates are also become popular materials for steel wheels. In order to accommodate fast and large scale production of automatic and efficient wheel disc production lines, manufacturers have higher requirements for the standardized production and the service life of the dies.
As a Chinese specialist designer and manufacturer of wheel production tooling, Xiaoya has developed tools and dies for high strength plate wheel rim and disc manufacturing that are suitable for automatic wheel disc stamping lines. According to the production process, there are 7 sets of dies in a complete wheel disc profiling, punching and reshaping process. The specific dies are shown as follows.
Process Pictures For Reference
Desingn Capacity
As a prominent Chinese supplier of tools and dies for steel wheel manufacturing, Xiaoya owns a provincial enterprise technology center and post-doctoral research center, as well as a tool and technological equipment research center with more than 20 senior tooling R&D engineers and over 50 skilled and experienced engineering and technological employees.
The tooling research institution specializes in the design and development of dies, gauges, fixtures, and welding stations for different types of steel wheel disc and rims, as well as the design and development of stamping dies.
Xiaoya has an excellent capacity in manufacturingwheel production tooling. We currently employ more than 50 professional technicians, and are well-versed in both domestic and international die material standards, such as the Chinese GB, American AISI, German SIN, Japanese JIS and others. In addition, we have a qualified purchasing system that is ISO 9001 certified, which ensure that the raw materials can meet design and manufacturing requirements.
We have a diverse range of advanced production equipment for wheel disc tooling wheel rim tooling and stamping tool manufacturing, including a large scale gantry machining center, horizontal machining center, vacuum quenching furnace, 1600T stamping line and other equipment.
Cooperative partner
TRADE Terms
1 Delivery Time
The manufacturing time will be 1-3 months from the date of receipted down payment.
1 month for factory testing (buyer come to factory for testing), optimize and customs clearance procedure.
Total need 4 months delivery time.
Loading sea port: Qingdao, China
2 Payment Terms
The payment terms will be T/T based on FOB Qingdao, China trade terms
.
3 Factory Testing
The Buyer can send engineers to Manufacturer's factory for testing those machines before delivery if it is necessary, and the cost of Buyer's engineers including flight, train, hotel and meals shall be at Buyer's own cost.
4 Warranty
The manufacturer shall guarantee the machines are brand new and correspond in all respects with the quality, specifications and performance as stipulated in this agreement, and also guarantee that the machines when correctly mounted and properly operated and maintained, will give satisfactory performance for a period of 12 months since the date of arrived in Buyer's port.
5 Offer Validity:
Price validity: 60 days from the date of this quotation.