Roll Forming Machine for Steel Wheel Rim Manufacturing

Product Details
Customization: Available
After-sales Service: Installation and Commissioning
Warranty: 12 Months
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
291
Year of Establishment
2005-08-16
  • Roll Forming Machine for Steel Wheel Rim Manufacturing
  • Roll Forming Machine for Steel Wheel Rim Manufacturing
  • Roll Forming Machine for Steel Wheel Rim Manufacturing
  • Roll Forming Machine for Steel Wheel Rim Manufacturing
  • Roll Forming Machine for Steel Wheel Rim Manufacturing
  • Roll Forming Machine for Steel Wheel Rim Manufacturing
Find Similar Products

Basic Info.

Model NO.
GX-23/300 GX-45/600 GX-48/800
Transport Package
Steel Pallet
Specification
GXJ
Trademark
Xiaoya
Origin
Jinan, China

Product Description

Roll Forming Machine for Steel Wheel Rim Production

Roll Forming Machine for Steel Wheel Rim Manufacturing

The roll forming machine is also known as a wheel rim forming machine, and is used for symmetrical or asymmetrical roll forming of steel wheel rims. Theroll forming equipment consists of the main machine, hydraulic transmission system, pneumatic system, PC control system and lubrication system.

Generally, small rim lines and large rim lines carry out 3 processes to complete the rim profiling. Each process uses one set of roll forming machines. However, the ultra-large line completes the rim roll forming operation through 4 processes. The 4 thpresses the roll press into a non-skid pattern.

Process Pictures for Reference
Roll Forming Machine for Steel Wheel Rim Manufacturing
Main Features


1. The forming dies on this wheel rim roll former comes with an easy to dismount design which ensures a quick change of the die, controlling the changing process to take only about 30 minutes.
2. Both the small and large wheel rim lines often use 3 roll forming machines that share one set of automatic load and unload mechanisms. These systems use a 3 process and 4 location design, which saves time and improves production efficiency.
3. The split design between the load/unload unit and the main machine allows for both manual and automatic operations.
4. The roll forming dies can be designed to be symmetric or asymmetric according to processing demands.
5. The upper and lower shafts are hydraulic driven. During the rim profiling, the rotating speed of the upper and lower rollers can be automatically adjusted.
6. The shafts can be adjusted at both dip angles and axial directions. This makes each part of the roller surface uniformity stressed, ensuring the precision.
7. The space between the upper and lower spindle is adjustable, as is the feeding speed.
8. The stroke of a side guide rail is also adjustable.
Roll Forming Machine for Steel Wheel Rim Manufacturing
Roll Forming Machine for Steel Wheel Rim Manufacturing

Main Technical Parameters of Roll Forming Machine
 
No. Items Parameters
1 Model GX-23/300 GX-45/600 GX-48/800
2 Roll forming force 230KN 400KN 500KN
3 Motor power of hydraulic system 62.5Kw 82.5Kw 165Kw
4 Length of mould on spindle 350mm 670mm 900mm
5 Upper and lower spindle speed 220r/min 200r/min 200r/min
6 Spindle material and diameter 40Cr, 140mm 40Cr, 200mm 40Cr, 220mm
7 Space between upper and lower spindle 240~380mm 340~480 380~520
8 Lower spindle stroke 140mm 140mm 140mm
9 Adjustable range of lower spindle feeding speed 2~10mm/s 2~10mm/s 2~10mm/s
10 Adjustable dip angle of lower spindle -0.35 ° ~0.17 ° ±0.35° ±0.35°
11 Side guide roller (Linear) Stroke 100mm 140mm 160mm
Adjustable stroke 50mm 50mm 50mm
12 Max. diameter of guide roller 200mm 220mm 240mm
13 Rated input voltage 380V 380V 380V
14 Rate input current 62.5Kw 82.5Kw 165Kw
15 Power cord section (copper) Single core 70mm 2(3+2) Single core 90mm 2(3+2) Single core 180mm 2(3+2)
16 Consumption of hydraulic cooling water 2000L /h 3000L /h 4000L /h
 

TRADE TERMS

Delivery Time

The delivery time will be around 1-4 months from the date of receipted down payment.
Loading sea port: Qingdao, China

Payment Terms

T/T,L/C are both acceptable

Factory Testing

The Buyer can send engineers to Manufacturer's factory for testing those machines before delivery if it is necessary, and the cost of Buyer's engineers including flight, train, hotel and meals shall be at Buyer's own cost.

 Warranty

1-year
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier